AtomAP · Energy Solutions — ESCO
Find out in 60 seconds. Then let a licensed ESCO — guaranteed savings, zero upfront cost — turn compliance into a cost win. Backed by 45 years of Atom System Japan engineering discipline.
AtomAP also delivers Technology & Systems · Telecommunications · Waste Management · Japan–Malaysia Business Gateway
EECA 2024 Compliance & BEI Benchmark Tool
EECA 2024's "Energy Consumer" threshold is based on total energy use and applies to any operation, including manufacturing. Office buildings ≥8,000 m² also face a published Building Energy Intensity (BEI) cap. Five more building types — education, healthcare, hotel, retail, and data centre — now have a BEI/PUE benchmark calculator too, using the same national methodology. Suruhanjaya Tenaga hasn't published statutory caps for those sectors yet. Check which applies to you.
Want this result and next steps emailed to you?
Optional — no obligation, no spam.
Thanks — we'll follow up shortly.
Statutory threshold: total energy consumption ≥ 21,600 GJ over 12 consecutive months = "Energy Consumer" under EECA 2024's Guidelines on Ascertaining Energy Consumer — applies regardless of building ownership. The RM figure is a rough illustrative conversion only. This is a directional self-check, not an official determination — formal notification comes from Suruhanjaya Tenaga. Savings range illustrative, based on comparable industrial EPC projects.
Want this result and next steps emailed to you?
Optional — no obligation, no spam.
Thanks — we'll follow up shortly.
Want this result and next steps emailed to you?
Optional — no obligation, no spam.
Thanks — we'll follow up shortly.
PUE = (facility electricity + RE electricity + backup fuel + chilled water, all converted to kWh) ÷ (installed IT load kW × operating hours). Formula per the AAIBE/UTM National BEI Benchmarking Project (Data Centre sheet), MESITA/PETRA-funded. Lower PUE is better; 1.0 is theoretical perfect efficiency. This is a directional self-check only, not an audited PUE measurement — Category 2 (PDU output) methodology assumed. No EECA statutory cap applies to Data Centre PUE at this time.
Licensed ESCO · ESCO426(2026)/24/2026





Our team’s track record
Delivered through Atom AP’s ESCO partnership with Innovast — the same certified REA/REM engineers behind both companies’ audit work.
Full scope of our ESCO license
Suruhanjaya Tenaga’s ESCO license covers more than audits and monitoring — here’s the full breadth, grouped by where you are in an engagement.
Understand where the savings are, and whether you’re in scope for EECA 2024.
Engineer the fix and get it installed, without disrupting operations.
Zero upfront cost, guaranteed results, kept running long after handover.
Service packages
Facility size, metering complexity and your compliance deadline all shape the right scope. Here is the general shape of each — exact figures come after a short scoping call, not before.
For first-time EECA 2024 compliance.
For larger facilities and listed companies with recurring compliance needs.
For facilities ready to implement, not just report.
Most facilities pursuing Package 1 or 2 above qualify for SEDA Malaysia’s Energy Audit Conditional Grant (EACG) — up to RM60,000 for commercial buildings and RM100,000 for industrial facilities, per site. We handle the eligibility check and the SEDA application on your behalf. Not sure which package fits — talk to us →
EPC and M&V, plainly
An Energy Performance Contract means we design, finance and implement the upgrade ourselves — you pay nothing upfront. Repayment comes only from a share of the energy savings we guarantee. If the savings do not materialise, that is our risk to carry — not yours.
Measurement & Verification, aligned to IPMVP — the international protocol for confirming energy savings — is how every guarantee is checked against a measured baseline, on an ongoing basis, not a one-time estimate. It is the same standard our InnoSense platform reports against.
How an engagement works
Investment-grade assessment of your facility’s energy profile.
Guaranteed-savings proposal, EPC structure, zero upfront cost.
Executed directly, or via delivery partners for larger scale.
IPMVP-aligned measurement & verification tracks results against guaranteed targets.
Backed by Atom System, Japan
Atom AP is the Malaysian arm of Atom System Co., Ltd. — a Japanese systems-integration and engineering firm operating since 1981. The same discipline that serves major Japanese enterprises now stands behind your EECA 2024 compliance.












Clients of Atom System Co., Ltd. (Japan) across its 45-year systems-integration and engineering practice. Atom AP is its licensed Malaysian branch.
How we work with you
Borrowed directly from the engineering culture behind Atom System: genba-shugi (現場主義) — the principle that the truth is at the site, not in a spreadsheet.

Genba, in practice — a power-quality reading logged on site, not estimated from a desk.
Every figure in our proposal traces back to a site visit and a logged reading — never a desktop estimate. If we haven’t measured it, we don’t claim it.
Written progress reports and one named point of contact, on a fixed cadence — so your internal stakeholders always have something concrete to circulate upward.
Where a facility is already well-run, we say so plainly. Our savings ranges reflect what measurement supports, not what closes a deal.
Measurement & verification doesn’t stop at commissioning. We track performance against the guaranteed target for the life of the contract, and flag drift before it becomes a shortfall.
The rest of AtomAP
ESCO is our newest license, not our only business — 45 years of Atom System Japan engineering also shows up here.
Contract & custom software development, SES engineer dispatch, and DX solutions — plus co-development partnerships, including our own DECIBERY platform and a Sakura Internet sales partnership.
MCMC-licensed content services and Maxis platform partnerships, connecting Malaysian and Japanese businesses with compliant, reliable telco infrastructure.
OHGI plastic carbonization technology — converting plastic waste into usable fuel, part of AtomAP’s wider sustainability portfolio alongside energy efficiency.
The trusted bridge for Japanese companies entering the Malaysian market — market entry support and on-the-ground relationship management, now extended into EECA 2024 compliance for the same manufacturing clients.
Licensed to execute independently — and backed by a delivery network including Innovast and Lotus West for larger-scale project capacity.


Book a free preliminary energy audit — no upfront cost, no obligation.